【中国关键词】核工业篇:乏燃料后处理中间试验厂
来源:中核智库 发布日期:2022-01-28

关键词73:乏燃料后处理中间试验厂
1990 年,国务院批准在中核四〇四有限公司建设动力 堆乏燃料后处理中间试验工厂。经过 20 年的努力,2010 年 12 月,中试厂热调试取得圆满成功,标志着中国掌握 了动力堆乏燃料后处理的核心技术,实现了核燃料闭式循 环的目标,为中国先进后处理工程技术的开发提供了重要 的研究实验平台。2017 年,以 60 吨生产规模的中试厂为 基础,中国自主设计的乏燃料后处理示范工程开工建设, 预计于 2023 年建成。
Keyword 73:Pilot Plant for Spent Fuel Reprocessing
In 1990, the State Council approved the construction of a pilot plant for reprocessing spent fuel at CNNC’s 404 Company Limited. The plant was hot commissioned 20 years later in December 2010, signaling China’s mastery of the technology for reprocessing spent fuel from power reactors in a closed nuclear fuel cycle. Since its hot commissioning, the plant has served as an important research platform for further development of advanced fuel reprocessing technology. In 2017, construction of China’s self-designed spent fuel reprocessing demonstration project, based on a 60-ton pilot plant, began and is expected to be completed by 2023.
网友评论请注意
遵守中华人民共和国有关法律、法规,尊重网上道德,承担一切因您的行为而直接或间接引起的法律责任。
中国核电信息网拥有管理留言的一切权利。
您在中国核电信息网留言板发表的言论,中国核电信息网有权在网站内转载或引用。
中国核电信息网留言板管理人员有权保留或删除其管辖留言中的任意内容。
如您对管理有意见请用 意见反馈 向网站管理员反映。